Edinburgh Cold Storage

Our team delivered the civil component of the Electrical package at the new cold-storage facility and office development for Auscold Logistics at Edinburgh in Adelaide’s north. Under the direction of Tristar Electrical we interfaced with the Builder’s civil programme to carry out the work with minimal disruption. Trenching and installation of electrical/comms and associated pits […]

McLaren Vale Development

An 8-lot development for Metro Homes located in the heart of the southern vales wine precinct commenced in the last quarter of 2020. DRASOL managed delivery of the sub-division, from preliminary site earthworks through to final asphalt roadway. Scope included: Survey set-out Site cut and fill Sanitary drainage Stormwater drainage, including underground retention/detention tanks Common […]

Flow Power Streaky Bay

In early September 2020, the Far West Coast township of Streaky Bay saw the first DRASOL team members arrive to commence construction works at the new Streaky Bay Solar Farm. As well as carrying out multiple work packages, DRASOL were engaged by the EPC contractor to provide WHS & Site Management services for the entirety […]

JH-GO Southern Water Program

DRASOL were engaged by JHGO to facilitate site investigation of the existing SA Water trunk main for conditional assessment and detailed engineering survey. Our remit was to manage access to South Road under live traffic, excavate and expose the service for the inspectors and hand back the carriageway without closing off the road. Scope of […]

Swan Reach Pump Station & Raw Water Pump Station

SA Water’s 54km long Swan Reach to Stockwell pipeline was built to supply the Barossa Valley, Lower North and Yorke Peninsula areas in South Australia. It was first used in the 1960s and was designed to supplement existing water supply. Enerven were engaged by SA Water to deliver two photovoltaic utility grade solar installations at […]

Morgan Pump Station 4

The final pumping station on the SA Water’s Morgan to Whyalla water pipeline also saw the DRASOL installation crews excel in the timely completion of the 184 NEXTracker single-axis trackers mounted on 15,456 PV modules. As part of SA Water’s Zero Cost Energy Future program, the Morgan pump station solar farms are integral to SA […]

Morgan Pump Station 3

SA Water’s Morgan-Whyalla Pump Station 3 is the third out of a total of four pumping stations on the Morgan to Whyalla pipeline that delivers approximately 66,000 megalitres of valuable water annually to the Upper Spencer Gulf towns in South Australia. Working closely with our clients Next Generation Electrical, our work teams successfully completed the […]

Morgan Pump Station 2

SA Water’s Morgan – Whyalla Pump Station 2 is one of a number of integral pumping stations that distributes treated water all the way to Whyalla on the Eyre Peninsula of South Australia. The pipeline is approximately 379 km long. This project comprised the installation of a 5.9 MW NEXTracker single-axis tracking system with associated […]

Morgan Pump Station 1

SA Water’s Morgan – Whyalla No.1 Pump Station, situated on the outskirts of the picturesque Murray River town of Morgan in South Australia’s Riverland district, was the location for DRASOL’s installation crews to construct a NEXTracker Horizon single-axis PV solar tracking system. Next Generation Electrical were the Engineering, Procurement and Construction (EPC) manager for the […]

Sunraysia Solar Farm

In June of this year, DRASOL were given the opportunity to provide our services to Decmil at the Sunraysia Solar Farm located 22km south of the township of Balranald in New South Wales. Joining the project in the later stages of construction, DRASOL completed 2,034 trackers (66.4MW) in ten weeks with a relatively small build […]