McLaren Vale Development

An 8-lot development for Metro Homes located in the heart of the southern vales wine precinct commenced in the last quarter of 2020.

DRASOL managed delivery of the sub-division, from preliminary site earthworks through to final asphalt roadway.

Scope included:

  • Survey set-out
  • Site cut and fill
  • Sanitary drainage
  • Stormwater drainage, including underground retention/detention tanks
  • Common service trench and install of electrical, communications and gas infrastructure
  • Potable and reclaimed water supply
  • Pavement prep and asphalt surface treatment
  • Concrete kerbs, spoon drains and field pits
  • As-con survey, engineering drawings and certification

CLIENTMetro Homes SA
LOCATIONMcLaren Vale, South Australia
SERVICESSite earthworks, drainage systems, common services trenches, traffic management
TIMELINE September – December 2020