Bungala Solar Farm

The Bungala Solar Farm Project is a solar power farm adjacent to Emeroo and Wami Kata near Port Augusta in South Australia. Stage One was connected to the grid in May 2018. The second and final stage was connected to the grid in early November 2018. The completed project contributes 220 MW to the electricity […]

Peterborough Solar Farm

Developed by Renew Power Group, Peterborough Solar Farm is a 5.6 MW facility located in Peterborough, South Australia. The clean power station consists of 15,624 Trina Solar panels mounted on NEXTracker single-axis tracking system and SMA inverters. This medium-scale project comprising 194 trackers was installed by DRASOL in two working weeks, equating to a 30% […]

Woodlawn Solar Farm

The Woodlawn Solar Farm is a 2.4 MW facility located in Woodlawn, New South Wales. The clean power station consists of the NEXTracker single-axis tracking system. This 90 tracker installation was established to provide energy for the bio-waste reactor at the Veolia Woodlawn recycling facility. DRASOL constructed the trackers and installed the modules on piles […]

Royalla Solar Farm

The Royalla Solar Farm is a 20 MW facility located in Royalla, ACT. DRASOL supplied the mechanical installers and technicians for this project as specified by the client. This project delivered significant benefits to Royalla and the wider community – in particular new clean electricity to meet the region’s energy needs. Working under challenging environmental […]

Moree Solar Farm

The Moree Solar Farm commenced construction operations in February 2015 and 12 months later it started supplying electricity to the grid. A 56 MW facility located in Moree, NSW. DRASOL provided mechanical installers and technicians as required by the client. The NEXTracker system continually oriented the solar panels with the arc of the sun, increasing […]

Barcaldine Solar Farm

The Barcaldine Solar Farm is a 25 MW facility located in Barcaldine, QLD. The 93 hectare site has approximately 79,000 solar modules. The site generates approximately 53,500 megawatt hours of renewable energy each year. The project has been designed using single-axis tracking technology maximising the total energy generated and the effectiveness and efficiency of each […]