SA Water’s Morgan – Whyalla Pump Station 2 is one of a number of integral pumping stations that distributes treated water all the way to Whyalla on the Eyre Peninsula of South Australia. The pipeline is approximately 379 km long.
This project comprised the installation of a 5.9 MW NEXTracker single-axis tracking system with associated PV modules.
Many thanks to NGE, Enerven and SA Water for providing a harmonious working environment enabling the various contractors to interface with little disruption or loss of efficiency.
CLIENT | Next Generation Electrical |
LOCATION | Maude, South Australia |
SERVICES | Mechanical and PV Module Installation, Quality Assurance, Technical Support, Tooling and Materials Handling. |
SYSTEM | NEXTracker – 184 Trackers installed and 15,456 Modules |
TIMELINE | 2019 |
CAPACITY | 5.9 MW |