This project was embarked on to separate regional and metropolitan train services and make room for the future construction of a 40km twin track rail link from Southern Cross Station to West Werribee. The works were completed in a 7 week programme with a 2 week shutdown.
DRASOL were engaged during the time-critical shutdown period to provide round the clock crews installing cross track services, signalling pit and pipe infrastructure and track formation drainage.
Services included:
• Mobilisation of plant and personnel from Adelaide 
• Signalling pit and pipe infrastructure 
• Under track crossings 
• Track drainage 
| CLIENT | Coleman Rail | 
| LOCATION | Tottenham, Victoria | 
| SERVICES | Under track crossings, signalling infrastructure, track drainage | 
| TIMELINE | 2011 | 